User story #1051
Inherit product backlogs and sprints to subprojects
Status:
Rejected
Priority:
Normal
Category:
Product backlog
Target version:
-
Blocked:
No
Alone:
Milestones:
Sprint:
Description
It have a project hierarchy that looks in the following way:
Group Project
+ Project A
+ Project B
The group project does not allow any trackers while project a and b do.
I can create product backlogs and sprints for each product,
but i want to be able to create a product backlog and sprints for the
group product that is inherited to its parent projects.
The current installed version is 0.10.
Related issues